Concrete Mix Calculator — How Much Cement, Sand and Gravel Do You Need in 2026?

A cubic yard of 1:2:3 concrete mix needs 7 bags of 94 lb Portland cement, 13.9 cubic feet of sand, 20.8 cubic feet of gravel and about 39 gallons of water in the US in 2026, costing $150 to $208 in materials.

Mix Calculator

Free, instant, US units. Enter your measurements, then press Calculate.

Your results will appear here after you press Calculate.

Recent calculations

    No calculations yet — press Calculate and your last 5 will show here.

    1 cement2 sand3 gravel
    1:2:3 mix — 7 bags of cement, 13.9 cu ft of sand and 20.8 cu ft of gravel per cubic yard.
    Cement bags per cubic yard — by mix 1:1.5:38 bags 1:2:37 bags 1:2:46 bags 1:3:65 bags Ordinary concrete ≈ 5–6 bags per yard.
    Cement per yard — richer mixes take more bags.

    A cubic yard of 1:2:3 concrete mix needs 7 bags of 94 lb Portland cement, 13.9 cubic feet of sand, 20.8 cubic feet of gravel and about 39 gallons of water in the US in 2026, costing $150 to $208 in materials. Below you will find the mix ratio chart, the water-cement ratio that actually sets the strength, what a cubic yard of each mix costs, when to mix your own and when to order ready-mix, and short answers for curing time, post holes, rebar, columns and stairs.

    How to Use the Concrete Mix Calculator

    It takes less than one minute.
    1. Enter the finished volume you need — or the length, width and thickness of the pour, and the calculator works the volume out for you.
    2. Pick a mix ratio: 1:2:3 for general work, 1:2:4 for leaner non-structural work, 1:1.5:3 for stronger structural work.
    3. Press Calculate. You get four answers: how many 94 lb bags of Portland cement, how much sand and gravel in cubic feet and cubic yards, how much water, and what the materials cost. Add 10% waste to the order, as with every concrete pour.

    Concrete Mix Formula — With a Real Example

    Here is the math, step by step. You do not need to remember it — the calculator does it for you — but showing the math builds trust. A ratio is written cement : sand : gravel, in parts by loose volume. One part cement, two parts sand and three parts gravel is a 1:2:3 mix. Loose sand, gravel and cement take up more room than the concrete they make, because the sand and cement paste fill the gaps between the stones. So you multiply the finished volume by the dry-volume factor of 1.54, then split the result by the ratio. Formula: dry volume = finished volume × 1.54; each material = dry volume × (its parts ÷ total parts). One 94 lb sack of Portland cement is about 1 cubic foot of loose cement.

    Real example — one cubic yard of 1:2:4 mix. One cubic yard is 27 cubic feet, so the dry volume is 27 × 1.54 = 41.6 cubic feet. The ratio has 1 + 2 + 4 = 7 parts, so one part is 41.6 ÷ 7 = 5.94 cubic feet. Cement: 1 part = 5.9 cubic feet, or 6 bags of 94 lb cement. Sand: 2 parts = 11.9 cubic feet (0.44 cubic yards). Gravel: 4 parts = 23.8 cubic feet (0.88 cubic yards). Water at a 0.50 water-cement ratio: 6 bags × 5.6 gallons = about 34 gallons. The same method at 1:2:3 gives 7 bags of cement, 13.9 cubic feet of sand, 20.8 cubic feet of gravel and about 39 gallons of water per cubic yard.

    Concrete Mix Ratio Chart — Cement, Sand and Gravel per Cubic Yard

    The table below is materials for one cubic yard of finished concrete, by mix ratio, using the 1.54 dry-volume factor. Bag counts are rounded up. The sand and gravel barely change from row to row — the cement does, and it is the expensive part. The strengths are typical planning figures, not a guarantee: no US standard assigns a strength to a volume ratio, and the water you add decides the strength, as the next section explains.

    Swipe sideways to see the full table →

    Mix ratio (cement : sand : gravel)Cement (94 lb bags)SandGravelTypical usePlanning strength
    1:1.5:38 bags (7.6 cu ft)11.3 cu ft22.7 cu ftStructural beams, columns, footings~4,000 PSI
    1:2:37 bags (6.9 cu ft)13.9 cu ft20.8 cu ftGeneral work: slabs, footings, walks~3,000 PSI
    1:2:46 bags (5.9 cu ft)11.9 cu ft23.8 cu ftGeneral purpose, post setting, fills~2,500 PSI
    1:3:65 bags (4.2 cu ft)12.5 cu ft24.9 cu ftLean fill, non-structural work only~1,500 PSI

    For ordinary concrete, about 5 to 6 bags of 94 lb Portland cement per cubic yard is typical — that is where the ready-mix terms five-sack and six-sack mix come from. A 1:2:3 mix is the recipe printed on standard US Portland cement bags. A 1:2:4 mix is the older general-purpose recipe and uses less cement. A 1:3:6 mix is lean fill only: do not use it for footings, load-bearing slabs or anything structural. For structural concrete — beams, columns, load-bearing slabs, anything an inspector will look at — follow the mix design from your engineer or local code, not a volume ratio from a chart.

    Water Decides the Strength, Not the Ratio

    This is the part most mix guides get wrong. Charts pair 1:2:4 with 3,000 PSI, but no US standard assigns a strength to a volume ratio. The Portland Cement Association's manual describes volume ratios as the arbitrary volumetric method that modern mix design replaced. Modern mix design proportions by weight and absolute volume to hit a target strength, and the number that sets strength is the water to cement ratio by weight. The table below is from the Portland Cement Association (PCA) manual, Table 9-3, for non-air-entrained concrete, with the water per 94 lb bag worked out — one gallon of water weighs 8.34 lb.

    Swipe sideways to see the full table →

    Target 28-day strengthWater-cement ratio by weightWater per 94 lb bag of cement
    2,000 PSI0.829.2 gallons
    3,000 PSI0.687.7 gallons
    4,000 PSI0.576.4 gallons
    5,000 PSI0.485.4 gallons

    One gallon of water per bag is the gap between roughly 4,000 and 5,000 PSI, so measure the water, do not just add shovelfuls. Start with about 5 gallons per bag and add only as needed — more water makes mixing easier but dramatically weakens the finished concrete, and it is the number one mistake in hand-mixed concrete. Freeze-thaw resistance comes from entrained air, not from the ratio: tiny air bubbles that give freezing water room to expand. You cannot hand-mix air-entrained concrete without an additive — ordinary concrete holds about 1.5% air, while the building code asks for 5 to 7% on exposed slabs in moderate and severe weathering areas. That is why outdoor slabs in cold climates are a ready-mix job, not a hand-mix job.

    What Does a Cubic Yard of Mix Cost in 2026?

    The table below is materials only, at 2026 US planning prices: Portland cement $13 to $18 per 94 lb bag, sand $30 to $40 per ton, gravel $35 to $50 per ton. Cement is the main cost — sand and gravel are cheap, and a second trip to buy more is not. Prices vary by region, so get a local quote before you budget.

    Swipe sideways to see the full table →

    Mix ratioCement cost per yd³Sand + gravel cost per yd³Total materials per yd³
    1:1.5:3$104 – $144$58 – $82$162 – $226
    1:2:3$91 – $126$59 – $82$150 – $208
    1:2:4$78 – $108$61 – $86$139 – $193
    1:3:6$65 – $90$64 – $90$129 – $180

    Compare that with the alternatives. Ready-mix delivered costs $125 to $195 per cubic yard, so mixing your own often costs about the same or more than a truck at volume — the saving is thin, and it disappears entirely once you value your time. Premixed bags are the most expensive route: an 80 lb bag costs $5 to $8 and yields 0.60 cubic feet, so a cubic yard needs 45 bags at $225 to $360. The rule is simple: mix your own for small jobs under about 1 cubic yard, buy premixed bags for the smallest jobs where a truck cannot reach, and order ready-mix for anything bigger or anything outdoors in a cold climate.

    Short Answers: Curing Time, Post Holes, Rebar, Columns and Stairs

    These are smaller topics, so they get short answers here instead of their own pages. **Curing time:** concrete cures by hydration, not by drying. Walk on it after 24 to 48 hours, drive on it after 7 days, and it reaches full strength after 28 days. Keep it damp for at least 7 days — curing time is set by the mix, the temperature and the water, and cold weather slows it down. **Post hole:** one hole, 12 inches in diameter and 3 feet deep, needs π × 0.5² × 3 = 2.36 cubic feet of concrete, or 4 bags of 80 lb premix. A 1:2:4 mix at about 2,500 PSI is enough for a fence post. **Rebar:** steel does not change the mix quantities — it takes up less than 1% of the volume — but reinforced work needs a stronger mix, 1:2:3 or 1:1.5:3, and a smaller maximum aggregate so the concrete flows around the bars. Rebar layouts are covered on the Wall Calculator and Footing Calculator pages. **Column:** a round column takes the same 1:2:3 mix as a slab — the volumes are on the Sonotube Calculator page, and the home page has the round column formula. **Stairs:** concrete stairs need 3,000 to 3,500 PSI and a stiff, low-slump mix so it holds its shape on the treads — the building code sets 3,500 PSI for steps in severe weathering areas. **Countertops:** use a special fine-aggregate, high-strength mix, not a standard 1:2:3.

    Common Mistakes When Mixing Concrete

    The most common mistake is adding too much water — it makes mixing easier and the concrete weaker, and one extra gallon per bag can cost you about 1,000 PSI. The second is measuring by shovel instead of by bucket: a ratio only works if the parts are the same size, so use one bucket for cement, sand and gravel. The third is using the wrong mix for the job: 1:3:6 is lean fill, not a footing mix, and a hand mix has no entrained air, so it does not belong on an outdoor slab in a cold climate. The fourth is forgetting the dry-volume factor — you need 1.54 cubic yards of dry material to make 1 cubic yard of finished concrete, because the sand and paste fill the gaps between the stones. And the fifth is ordering exactly the calculated volume with no waste: add 5% for a clean, formed pour and 10% as a safe default.

    Frequently Asked Questions

    How many bags of cement do I need per cubic yard?

    About 5 to 6 bags of 94 lb Portland cement for ordinary concrete. By ratio: 8 bags for 1:1.5:3, 7 bags for 1:2:3, 6 bags for 1:2:4, and 5 bags for 1:3:6, per cubic yard of finished concrete.

    What is the best concrete mix ratio?

    1:2:3 is the best all-round ratio for general work — slabs, footings and walks — at about 3,000 PSI. Use 1:1.5:3 for stronger structural work, 1:2:4 for leaner general-purpose work, and 1:3:6 for non-structural fill only.

    What PSI is a 1:2:3 concrete mix?

    About 3,000 PSI as a planning figure, but the ratio alone does not set it. Strength comes from the water-cement ratio by weight: 0.68 pairs with 3,000 PSI and 0.57 with 4,000 PSI, so measure the water — one gallon per bag is worth about 1,000 PSI.

    How much water do I add to a concrete mix?

    Start with about 5 gallons of water per 94 lb bag of cement and add only as needed. At a 0.50 water-cement ratio, one cubic yard of 1:2:3 mix needs about 39 gallons of water, and 1:2:4 needs about 34 gallons.

    Is it cheaper to mix your own concrete or buy ready-mix?

    At volume, no: self-mixed 1:2:3 costs $150 to $208 per cubic yard in materials, against $125 to $195 delivered for ready-mix. Mix your own for small jobs under about 1 cubic yard, and order ready-mix for anything bigger.

    How long does concrete take to cure?

    Walk on it after 24 to 48 hours, drive on it after 7 days, and it reaches full strength after 28 days. Keep it damp for at least 7 days. Curing time depends on the mix, the temperature and the water — cold weather slows it down.

    How much concrete mix do I need for a post hole?

    One hole 12 inches in diameter and 3 feet deep needs 2.36 cubic feet of concrete, or 4 bags of 80 lb premix. A 1:2:4 mix at about 2,500 PSI is enough for a fence post.