Concrete Calculator

Concrete Calculator — How Much Concrete Do You Need?

This free concrete calculator estimates how much concrete you need for a slab, footing, round form tube, wall, column, stairs or curb — in cubic yards, in 40, 60 and 80 lb bags, and in dollars, based on ASTM and IRC standards.
Posted November 1, 2026 · Back to the blog

length width × thickness ÷ 27 = yd³ Then add 10% waste before you order.
Volume = length × width × thickness ÷ 27, plus 10% waste.
10 × 10 ft slab, 4 in — the worked example Volume — 1.23 yd³ Order — 1.36 yd³ (+10% waste) Bags — 62 × 80 lb Concrete-only — $170–$265 Installed — $600–$1,200
The 10 × 10 ft, 4 in slab — volume, bags and cost in one place.

This free concrete calculator estimates how much concrete you need for a slab, footing, round form tube, wall, column, stairs or curb — in cubic yards, in 40, 60 and 80 lb bags, and in dollars, based on ASTM and IRC standards.

How to Use the Concrete Calculator

1. Choose your project — slab, footing, round post hole (tube form), wall, column, stairs or curb. 2. Enter the length, width and thickness in feet and inches. For a round hole, enter the diameter and depth.
3. Set the waste factor to 10% and press calculate. You get cubic feet, cubic yards, bag counts, weight and cost.

Concrete Calculator Formula

The concrete calculator formula is simple: volume = length × width × thickness, all in the same units. For a slab, measure in feet, divide the thickness in inches by 12, then divide the cubic feet by 27 to get cubic yards. One cubic yard is 27 cubic feet. Add 10% waste as a rule — 5% is enough for a clean, well-formed pour, but use 10% to 15% on rough ground, hand-dug footings or irregular shapes, where over-digging is likely.

Slab example

A 10 × 10 ft slab, 4 inches thick: 10 × 10 × (4 ÷ 12) = 33.3 cubic feet. 33.3 ÷ 27 = 1.23 cubic yards. With 10% waste: 1.36 cubic yards. That is 62 bags of 80 lb mix, or 82 bags of 60 lb mix. A bigger 20 × 20 ft slab at the same thickness needs 4.94 cubic yards, so order 5.43 cubic yards — 245 bags of 80 lb mix. At that size, a truck is far cheaper and faster than mixing bags by hand.

Round form tube and round post example

For a round form, the formula is π × radius² × depth. A 12-inch round form tube, 4 feet deep: 3.14 × 0.5 × 0.5 × 4 = 3.14 cubic feet, or 0.12 cubic yards — 6 bags of 80 lb mix. A fence post in a 10-inch hole, 30 inches deep, needs about 0.05 cubic yards, or 3 bags of 80 lb mix. For 20 fence posts, that is about 1 cubic yard, or 50 bags — still a bag job, unless you want a small truck delivery.

Formulas for Every Shape

Real jobs are rarely one flat rectangle. Use the same unit rule for every shape — convert all dimensions to feet first — then use the formula for that shape. A footing is length × width × depth: a 20 ft footing, 12 inches wide and 12 inches deep, needs 0.74 cubic yards. Footings must go below the local frost line and at least 12 inches below grade.

Swipe sideways to see the full table →

ShapeFormulaWorked example
Slab / footingLength × Width × Thickness10 × 10 ft, 4 in = 1.23 yd³
Wall(Length × Height − openings) × Thickness20 × 8 ft wall, 8 in, less a door = 3.43 yd³
Column (round)π × radius² × Height12 in column, 10 ft tall = 0.29 yd³
Circular padπ × radius² × Thickness10 ft pad, 4 in = 0.97 yd³
StairsWidth × tread × riser × n(n+1) ÷ 25 steps, 7 × 11 in, 4 ft wide = 1.19 yd³
Monolithic slabSlab + thickened edge footingSlab body plus perimeter edge, one pour
Curb & gutterCurb section + gutter section × lengthAdd both cross-sections, × run length

Concrete Unit Converter

This concrete calculator doubles as a concrete unit converter: enter any length, width or thickness in feet, inches, yards, meters or centimeters and it converts the result into cubic yards and cubic feet, plus the weight in pounds, the bags and the delivered cost. To convert cubic feet to cubic yards, divide by 27 — one cubic yard is 27 cubic feet.

How Many Bags of Concrete Do I Need?

One 80 lb bag of concrete mix makes 0.60 cubic feet, one 60 lb bag makes 0.45 cubic feet, and one 40 lb bag makes 0.30 cubic feet. These yields are the standard yields printed on US bagged concrete mix. Divide your volume in cubic feet by the yield of one bag, then round up — you cannot buy part of a bag.

Swipe sideways to see the full table →

Bag sizeYield per bagBags per cubic yardBest for
80 lb0.60 cu ft45Slabs, driveways, footings — best value
60 lb0.45 cu ft60Small jobs, easier to carry
50 lb0.375 cu ft72Small repairs
40 lb0.30 cu ft90Fence posts, small patches

For the 10 × 10 ft slab above: 36.7 cubic feet with waste ÷ 0.60 = 61.1, so buy 62 bags of 80 lb mix. One 80 lb bag covers about 1.8 square feet at 4 inches thick. Unopened bags can usually be returned, but running short in the middle of a pour is a much bigger problem.

Bags or a Ready-Mix Truck?

Use bags when your job is under 1 cubic yard — about 45 bags of 80 lb mix. That covers fence posts, small pads, steps and repairs. Order ready-mix concrete when the job is over 1 cubic yard. A standard truck holds about 10 cubic yards, and most suppliers have a minimum delivery of 1 to 1.5 cubic yards. Watch out for short-load fees: ordering less than the supplier minimum, often 3 to 5 cubic yards, can add $50 to $150.

Swipe sideways to see the full table →

ProjectVolumeOrder with 10% waste80 lb bagsBags or truck?
10 × 10 ft slab, 4 in1.23 yd³1.36 yd³62Bags or small truck
12 × 12 ft slab, 4 in1.78 yd³1.96 yd³88Truck usually cheaper
20 × 20 ft slab, 4 in4.94 yd³5.43 yd³245Truck delivery
12 in round form tube, 4 ft deep0.12 yd³0.13 yd³6Bags
Fence post, 10 in × 30 in0.05 yd³0.06 yd³3Bags
24 × 24 ft garage, 5 in8.89 yd³9.78 yd³440Truck + pump

How Much Does Concrete Cost in the US in 2026?

Ready-mix concrete costs about $110 to $165 per cubic yard for material in the US in 2026, with a national average near $125 to $128 per yard. Delivered, most homeowners pay $125 to $195 per cubic yard. The Midwest is cheapest, around $120 per yard; California and the Northeast can reach $165 or more. An 80 lb bag costs about $5 to $8 at US hardware stores. A finished 4-inch slab costs $6 to $12 per square foot installed.

What changes the price? Thickness, PSI strength, rebar or wire mesh, the finish, and where you live. A pump truck adds $200 to $500. These are planning ranges, not quotes — always get a written quote from a local supplier.

How Thick Should Concrete Be, and How Strong?

Thickness and strength work together. A slab that is too thin cracks, even if the concrete is strong. The International Residential Code (IRC) sets the minimum slab thickness at 3.5 inches; in practice, US contractors pour 4 inches as the standard. Put 4 inches of compacted gravel under the slab first — the gravel base, or subgrade, drains water and stops the slab from settling. Add rebar or welded wire mesh for driveways and garage floors.

Swipe sideways to see the full table →

ProjectThicknessPSI strengthNotes
Patio, sidewalk4 in3,000 PSIStandard residential mix
Driveway4–6 in3,500–4,000 PSI4,000 PSI in freeze-thaw states
Garage floor5–6 in4,000 PSIAdd rebar or wire mesh
Footing12 in deep min.3,000 PSIBelow frost line, 12 in below grade
Fence post30 in deep3,000 PSIPost in the center, concrete all round

PSI means pounds per square inch — the strength of the concrete after 28 days of curing. A 3,000 PSI mix is enough for patios. Driveways need 3,500 to 4,000 PSI, because cars are heavy and winter freeze-thaw cycles break weak concrete. In cold states, ask for air-entrained concrete.

How much does concrete weigh? Standard concrete weighs about 150 pounds per cubic foot, so one cubic yard weighs about 4,050 pounds — just over 2 tons. Reinforced concrete is about 150 lb per cubic foot, and lightweight concrete is about 110 lb per cubic foot.

How long does concrete take to cure? It sets firm within a few hours and is usually safe to walk on after 24 to 48 hours. It takes light vehicle traffic after about 7 days and full loads after 28 days, when it reaches its design strength. Concrete cures by hydration, not by drying out — keep the surface damp during the first week for a hard, crack-resistant finish.

Concrete Mix Ratio — 1:2:3 and 1:2:4

Concrete is Portland cement, sand, gravel (called aggregate) and water. A common mix ratio by volume is 1 part cement, 2 parts sand, 3 parts gravel — written 1:2:3 — which gives about 3,000 PSI. A 1:2:4 mix is a little weaker, about 2,500 to 3,000 PSI, and is used for paths and non-structural work. Stronger structural work uses a tighter mix, about 1:1.5:3, and lean fill can run 1:3:6. The water-cement ratio matters most: use 0.45 to 0.50 parts water to 1 part cement by weight. Adding extra water makes concrete easier to pour, but it weakens the finished slab. For bagged mix, just add the water printed on the bag — about 6 pints per 80 lb bag, with a working range of 6 to 9 pints.

Common Mistakes When Calculating Concrete

The most common mistake is ordering the exact volume, with no waste. Add 10% every time. The second is measuring the thickness wrong. The third is adding too much water to bagged mix. The fourth is skipping the gravel base and pouring on soft soil, which settles and cracks the slab. And the fifth is guessing the PSI: a patio mix will not last as a driveway.

Frequently Asked Questions

How much concrete do I need for a 10 × 10 slab?

1.23 cubic yards, or 1.36 cubic yards with 10% waste. That is 62 bags of 80 lb mix, or 82 bags of 60 lb mix.

How many cubic yards do I need, and how many yards should I order?

Measure length × width × thickness, divide by 27, then add 10% waste. Order ready-mix when the total is over 1 cubic yard.

How many bags of concrete do I need?

Divide your volume in cubic feet by the yield of one bag and round up. One cubic yard takes 45 bags of 80 lb, 60 bags of 60 lb, or 90 bags of 40 lb.

How much concrete do I need for fence posts?

One post in a 10-inch hole, 30 inches deep, needs about 3 bags of 80 lb mix. Twenty posts need about 1 cubic yard, or 50 bags.

How much gravel do I need under a concrete slab?

About 4 inches of compacted gravel under a 4-inch slab. For a 10 × 10 ft patio, that is about 1.36 cubic yards of gravel.

How do I use the Sonotube concrete calculator?

Enter the tube diameter and depth. A 12-inch tube, 4 feet deep, needs 0.12 cubic yards — 6 bags of 80 lb mix.

How do I square a concrete slab before pouring?

Use the 3-4-5 method: mark 3 feet along one side and 4 feet along the other side from the same corner — the diagonal between those marks must be exactly 5 feet. Then check that both diagonals of the whole slab are equal.

What is the formula for calculating concrete?

For a slab: length (ft) × width (ft) × thickness (in) ÷ 12 ÷ 27 = cubic yards. For a round hole: 3.14 × radius (ft)² × depth (ft) ÷ 27 = cubic yards.

How much does a concrete project cost?

Ready-mix costs $125 to $195 per cubic yard delivered in 2026. A 4-inch slab costs $6 to $12 per square foot installed. Get a local quote for an exact price.

How much does a cubic yard of concrete weigh?

About 4,050 pounds — just over 2 tons — at the standard density of 150 pounds per cubic foot.

What is the standard concrete mix ratio?

1:2:3 by volume — 1 part Portland cement, 2 parts sand, 3 parts gravel — which gives about 3,000 PSI. Keep the water-cement ratio at 0.45 to 0.50.

Why should I add a waste percentage?

The ground is never perfectly level, forms bow, and some concrete is lost to spillage and what sticks in the mixer. Add 5% for a clean pour and 10% to 15% on rough ground or hand-dug footings.

Can I calculate concrete for columns, walls, and stairs?

Yes. Use the formulas in the table above — for a wall, subtract door and window openings first. The calculator covers slabs, footings, columns, walls, stairs, curbs and round pads.

Should I use bagged concrete or ready-mix?

Use bags under 1 cubic yard — about 45 bags of 80 lb mix. Over 1 cubic yard, a ready-mix truck is usually cheaper, faster, and gives a more consistent pour.

How accurate is this concrete calculator?

The math is exact, so the answer is only as good as your measurements — measure twice, add 10% waste, and confirm the order with your supplier. It is a planning estimate, not engineering advice for load-bearing work.